Construction industry veteran Louis Gunnigan chronicles how he went about building the dream home to retire to: a low maintenance bungalow near the sea.

In this article we cover:

  • How he found the site
  • Choosing an architectural designer
  • Creating a Values Statement for his architect
  • Guiding principles for the house and how that affected design decisions
  • House size and budgeting for the build
  • Cost details on key elements
  • Rainwater harvesting system details
  • Top design tips and ideas for a compact home, including storage
  • Building methods: exploring the options from volumetric to ICF
  • Choice between direct labour and main contractor
  • Timeline and supplier list
  • Floor plans

My wife Gaye and I were in rented accommodation and fast approaching retirement. As the rented accommodation market is volatile, we needed to own our home when we reached retirement. And having worked in construction for so many years, building a house was something I’d always dreamed of. It was one of those bucket list projects.

Just before the pandemic kicked off, we found the site. It was Gaye’s daughter who spotted it and had us go look at it as soon as it came up for sale.

Site size: 740sqm
House size: 95sqm
Bedrooms: 2
Site cost: €170k
Build cost: €340k
Heating: Air to water heat pump
Ventilation: Centralised mechanical with heat recovery
Construction: ICF
BER: A1

It was a plot at the back of somebody else’s house, with a direct entrance onto the road. Three minutes from the railway station (with regular trains just 25 minutes duration to Dublin city centre),15 minutes from the airport, 5 minutes from shops, and it’s a 10 minute walk to the beach. The dream.

building home to retire to

Choosing a Architectural designer

I had a lot of connections in the construction industry with people who are very innovative in design and I asked one of them to look at our options. The narrow site was tricky to work with and this first architect gave us some of what we wanted but not all. It became very clear to us after a short amount of time that he wasn’t the person to go with.

The main takeaway from this experience is that you have to know why you want things, not just what you want. Because if you don’t express that to your architect very clearly at the start, they will give you what they think you want. And that’s not necessarily the same thing.

So we spoke to the architect about it, and he said he didn’t think he could design the house we wanted on this plot, and we said fair enough. We left it at that and then went to another architect, a local architect, who had designed lovely houses in the area. And he was a perfect fit.

building home to retire to

The dream home to retire to: Values Statement

When we bought the site, we didn’t have all the funding secured yet to build the house, which meant we had a bit of time to look at our design options. And even though the site came with planning permission, the house that had been approved didn’t suit us, so we had to start from scratch.

building home to retire to

I wrote a Values Statement for our architect; half a page to state who we are and what is important to us. It included our circumstances – two people approaching retirement who need a home to suit us as we got older. Low running cost and maximum accessibility were important. This would prompt an accessible design – ideally a bungalow, maximised use of space, and high energy efficiency.

We wanted to maximise the use of the building plot to suit a retired lifestyle, but we wanted this achieved in the most planet-friendly way possible. Whilst this home would be for two people, it would need to be designed so that future generations could adapt it into a family home.

Between us Gaye and I, from our previous marriages we have six children, and two grandchildren as well, so we wanted a space where we can entertain people and also have the kitchen run seamlessly to the garden and south facing patio.

The issue of accessibility, specifically around thresholds was a big thing for us, as we had both witnessed our ageing parents struggle with steps as they entered old age. We were both conscious that in 20 years’ time that’s where we’re going to be. Being an engineer, I also gave the architect 10 pages of a technical brief of what I wanted. He said the Values Statement could have been written by a philosopher but the technical brief was definitely written by an engineer, such was the level of detail provided.

House size

We were initially looking at a bigger house than what we ended up with. When we spoke to the architect, he said ‘to maximise the use of the site, a smaller house is better. And remember there are only two of you; do you want to clean rooms you don’t use?’ Those two arguments were enough to convince us.

building home to retire to

Energy efficiency, airtightness and the environment

At the design stage, we realised the building energy rating (BER) was an A2 but right on the margin of A1.

We got it up to A1 by adding more insulation. We maxxed out on insulation everywhere and for the walls upgraded the specification from 330mm to 350mm EPS and added more solar panels. We’d planned for six initially and in the end went for 14. That brought us down even further and very close to passive standard.

Rainwater harvesting

I could never understand the logic of flushing your toilet with potable water and to avoid this we insisted on the inclusion of a rainwater harvesting system to provide water for toilets and laundry.

We put a 3,000 litre tank in the back garden, so that’s more than enough. We bought the whole thing for €2,350 (tank, pump, header tank, etc.). As an overall percentage cost of the project, it was small. While we won’t save money from it, maybe we will in future as water charges may have to be paid at some stage

building home to retire to

Solar gain

From an energy point of view, because the site is on a North South axis we had to put the windows on the south side, which meant we also had to look into how to control the solar gain to prevent overheating.

building home to retire to

Budget

We went for a high spec house because we wanted to do this only once. We quickly became aware that building a house can cost you anything from €2,000 per sqm to €4,000 when you take into account the site, landscaping and everything.

And we knew we were going to be on the upper end of that. We told the architect straight off that’s where we’re going to be.

Taking into account our budget and the narrow site, he designed a 95sqm bungalow. It might seem small but that’s the size of an average three bedroom house on two storeys. In our house every square inch of space is usable apart from the entrance hall which is the only circulation space. A brilliant result.

With the builder we went with a fixed price; we had both a bill of quantities and schedule of rates. The schedule of rates built up a final sum but we were aware some of those could shift – for example we took out a door and put in pocket doors as well as swinging doors – and we changed the insulation.

From all of this I had a fair idea what it was going to cost, as the design was tailored to our budget. We had a price initially of €300k including VAT, but then building costs skyrocketed with the pandemic and that was the main reason we ended up with an inflated final figure.

We made a big saving thanks to the development contribution waiver; we weren’t charged any development contribution levies. For the Irish Water connection we had to pay the fees upfront and were entitled to a refund on completion of the house.

building home to retire to

Exploring building methods

If you are going to go with a modern building method, you have to get the architect to talk to the people who provide the different options. Because there are things they can and cannot do. You might design something of a certain size, and they’ll say ‘no we can’t do that with our manufacturing process’. Whereas if you designed it slightly differently they could.

We looked at volumetric construction first, because it would be quick and more cost effective. The cost was about 30 per cent lower than any other method of construction, even bringing it in from Latvia.

We were going to get the entire house built in three or four sections in a factory in Latvia. The architect designed the house so we could do that, according to their module sizes.

We’d spoken to a logistics company about how to bring it here – you can bring a load 10.3m long at the back of a truck and 3.2m wide so everything had to be built to modules of that size. It was going to take them 12 weeks to build it in the factory, and then it was going to take them three weeks to put it together on site.

building home to retire to

There was a lot of to-ing and fro-ing to make sure it was built to Irish standards; I was quite confident that with my experience in construction and the architect’s experience that we could do that.

We shortlisted three factories in Latvia and when we looked at the finer details, we realised we couldn’t do it. While we could get the modules over here, to our road, there were so many overhead wires coming into the site that we weren’t going to be able to get it from the road to its final location.

What is volumetric constrcution?

This modern building method entails building the entire house in a factory, including the vast majority of finishes – from sanitaryware to floor coverings. The house is build in modules and each of them is transported by truck to the site to be craned in place. The modules are connected on site to create the finished house. Commonly used for commercial buildings

ESB Networks and Irish Water were also going to be problematic as this was being planned as a non-standard build. The timescales from both of these organisations were just too long for us. We would be ready for connections 15 weeks from starting but Irish Water eventually gave us a connection in week 39, whilst it took ESB Networks a whopping 49 weeks from application to power on.

This is a major issue for anyone considering using volumetric construction. You might get your house faster, but the utility companies are still working to a timescale that is only suitable to traditional construction.

Another setback was that volumetric construction comes with flat roofs, and we were going to have to get an A frame roof. We wanted the A frame for the solar panels, and because we wanted it to look like a cottage. Which it did in the end.

building home to retire to

What was interesting about going through this process was that it opened up a lot of other discussions about getting the finishes in early, and that really helped the build to go smoothly.

After that we looked at more straightforward timber frame builds but there was no huge cost advantage there. We ended up choosing Insulating Concrete Formwork (ICF) for its speed and the guarantee that
we’d get an airtight house at the end. It wasn’t any cheaper than the alternatives.

There are other perks with ICF, things like chasing walls are so much easier. And we could order the windows straight away as the window size was set from the construction drawings, unlike with a block build where the window company does a site survey to determine the window sizes.

Direct labour vs main contractor

I had looked into managing the whole build by direct labour myself, but I very quickly found out that the smaller builders in Dublin are really struggling to get people themselves, so I knew I wouldn’t be able to do it on my own with no history of dealing with those people directly.

Through the architect, we sourced a builder and negotiated the contract sum. I took a project management role to deliver the project.

building home to retire to

Moveable island for small kitchen. The house isn’t that wide which meant adding an island to what was a small kitchen wasn’t going to be possible. But we still wanted the additional prep space. I had the idea to put the island on castors; it’s quite small 1400mmx600mm but effectively it’s a movable breakfast bar. We move it outside for barbeques, which is easy to do as there are no thresholds.

Foldable banquette.
We put in a banquette at end of the kitchen with a table that goes up against the wall and that saves you 300- 400mm in space every time.

Dog shower in utility room. Very simple thing to do when building, harder to retrofit.

Create garden areas. It’s important to give some thought to how you’re going to use the garden. I’ve the back garden for vegetables which is my passion, including a greenhouse and shed, and the front garden is for flowers which is Gaye’s passion.

Storage. With a house the size of ours we had to be careful about storage; we didn’t want to have to lug stuff up and down ladders and didn’t want to use up precious internal floor space for things like Christmas decorations. So I got a shed that’s 8sqm in size, half of it is insulated with a chest freezer which gives off a bit of heat. It cost €3k in total as compared to adding storage in a house that cost €2k/sqm to build.

Futureproofing. The attic space is big and ready for future development

Walls: 350mm ICF (Insulating Concrete Formwork) consisting of 100mm outer leaf EPS insulation, 150mm concrete core. 100mm inner leaf EPS insulation, U-Value 0.16W/sqmK

Floor: 150mm PIR inslation board in standard build up, U-Value 0.16W/sqmK

Roof: 150mm PIR between rafters, 62.5mm PIR under rafter, U-Value 0.13W/sqmK

Windows and doors: double glazed aluclad, average U-Value 1.2W/sqmK

building home to retire to

Architect
JE Architecture, Dublin, jearchitecture.ie

Structural Engineer
MTW Consultants Ltd, Dublin, mtw.ie

BER/Environmental Engineer
Certified Energy Ratings, Dublin

Quantity Surveyor
Costing Construction Ltd, Dublin

Contractor
TMC Construction, Dublin, tmcconstruction.ie

Heating and ventilation
Pipelife, pipelife.ie

Solar panels
Solar PV Panels Ireland, Longford, solarpvpanelsireland.ie

Materials/Heating/Ventilation supplier
Brooks

Tiling
Tilestyle & LTB Tiles and Bathrooms

Lighting
JR Lighting Newry, jrlighting.co.uk

Insulation
Floor: Unilin Thin-R XT/PR-UF
Roof: Quinn Therm QR and Quinn Therm QL-Kraft

Windows and doors
Gama

Share and Enjoy !

Shares

Louis Gunnigan

Written by Louis Gunnigan

Louis Gunnigan is a construction industry veteran who got to realise his dream of building his own home when he approached retirement.