Package suppliers aim to take some of the stress out of self-building; so what do you get when you sign up?
Self-build kit homes may be a relatively recent phenomenon but they have their origins in the pattern book builders of the 18th Century. Pattern books allowed people in one country to copy the styles and fashions in architecture from another and, by the 1730s, several were available. These were filled with engraved plates, essays on architectural theory and practical advice on construction and materials. James Gibbs’ Book of Architecture published in 1728 was a bestseller. It was aimed at “gentlemen who might be concerned in building, especially in remote parts of the country, where little or no assistance can be procured”. In the first half of the 20th century, more than 75,000 Sears kit homes were built across America and fashion crossed the Atlantic a decade later. The late Murray Armor (who went on to become probably the first self-build guru), and his wife, won money in a 1960s television show on their honeymoon in the US. On their return, they decided to build their own home in Nottinghamshire. Murray’s frustration at the lack of advice and information for self-builders led him to form one of the earliest self-build package suppliers. By the 1970s, a curious public was queuing to see timber framed houses at Ideal Home Exhibitions in Belfast and Dublin. Companies were offering not just design services but ‘design and build’ opportunities. Nowadays, self-build package suppliers offer a ‘one stop shop’ which can include design and planning, manufacture and supply of kit, external cladding, roofing and supply of external joinery, and even an internal fit-out of bathrooms and kitchens.Choice of Company
You will be able to specify your own rules of engagement with a package company. It can have as much or as little involvement in your project as you wish. The bare minimum is supplying the frame. A typical company will offer several routes. The cheapest and most common is a design and frame supply service which leaves the self-builder to project manage the rest of the build. You can be put in touch with a local project manager or instead opt for a full turnkey package. There are three main criteria influencing your choice of supplier:- A specialist in your preferred construction type. The most popular is timber frame, whether open or closed panel, or the more specialised oak frame. Structural insulated panels (SIPs), insulated concrete formwork (ICF) and steel frame are alternative build systems.
- Selection of materials is also important because ultimately suppliers will tie you into choosing these as part of their package. Some suppliers allow you to simply buy a timber frame from them but many will want you to go further. This is the moment when you should decide how flexible you want to be and how much control you want to have over your home. Before signing, make sure you are happy with the materials on offer.
- The in-house design service is another option. Kit homes of the last century are closely associated with period styles, but package suppliers have become increasingly adventurous and now usually offer a contemporary range as well. Opting for a bespoke design service will allow for lots of variations to concepts. You can of course also bring your own plans designed by an independent building professional. Written customer recommendations are a common feature of brochures and websites but ask to speak directly to former customers, privately. Ask what the project management experience was like. Even better, see if you can visit their homes to view the finished product. A visit to the factory is also common.
Potential Pitfalls
As with all forms of self-build, there are things to look out for when commissioning a kit home. To start with, make sure you are certain you like the styles offered by the company. The design that the company draws up for you remains its copyright. You can’t simply engage the company at design stage, terminate the service and take the plans elsewhere to be built. Do all your research before committing. You will be able to amend the plans and work with the designer until you are happy with them. Once on site, major changes are not permitted. This means there are a lot of design decisions to be made at the preliminary stage. But suppliers will work very hard with clients to make sure they have correctly interpreted your requirements. However, as one leading supplier said, “Over 90% of our work to date has been custom designed by the owners’ architect so the product has developed into a genuine bespoke build system that can be adapted to almost anything.” Since you are ordering bespoke work and materials which can’t be sold on, especially in the case of timber frame kits, you will often be asked to pay large sums upfront. Make sure you discuss payment terms from the start. One option is to ask your solicitor to facilitate making payments to your suppliers. Monies can be paid into a solicitor’s account and, after a satisfactory interim valuation has been agreed, funds can then be transferred to suppliers. This provides everyone – you, your supplier and your lender – with greater protection.Points to ponder
Many package suppliers nowadays will undertake the complete ground works. This is because the accuracy of the foundations is critical, especially with timber frame where there is very little tolerance of error. If you choose or are asked to oversee the work yourself, the kit supplier will generally provide foundation drawings with pop up locations as well as the critical dimensions along with the static load calculations. In this scenario the company’s responsibility only begins when they arrive on site to erect the shell and if this is delayed there may be liabilities that will have to be covered by you. There is a view that workers from Northern European suppliers tend to be more focussed and pay more attention to detail than local tradesmen, but this is not always the case and many won’t speak the same language as you, which can make communication difficult, especially if there are local people involved as well. A further twist is that both communities may feel that the whole job should have been done by them alone. Finally, and before you even get started, make sure that the large delivery lorries carrying the sections are able to reach your site. The alternative is to employ a crane, but many rural sites up a lane or surrounded by trees may not be suitable, without special arrangements, for a house fabricated in sections in a factory. Why not make good use of the rate of exchange between the euro and pound? If you live in NI, check out prices for self-build packages in ROI, and vice versa. One company based in Leinster has several houses built in NI and if a selfbuilder is able to obtain an end user certificate, it can export at zero per cent VAT to anywhere in the UK where new builds are VAT exempt. Suppliers often prefer not to have PC sums but offer a fixed price so they work hard with clients in advance to finalise a specification. Enquire if you can choose from ‘no cost options’ included in a standard specification. But if you really want a Philippe Starck bath, you will have to pay a premium!Paying the price
If you have ever watched Grand Designs, you will know that setting a realistic budget is essential for any self-build project. Package suppliers vary in their price structures, but typical estimated costs may include:- Free initial consultation.
- £600 (€650) for design drawings.
- £2,000 (€2,200) to progress the drawings through planning and building regulations.
- A deposit of 20% for the kit.
- The remaining 80% payable upon delivery
- Delivery, scaffolding and waste disposal should be included in the contract price.
- Planning application fees.
- Cost of connecting your site to services.
- Cost of site.
- Budget for decoration and finishes.
- Site clearance.
- Contributions to the local council (development fees) which can run upwards of €15,000 in ROI.
Additional information
Rory Power of Ambihouse, Co Wicklow, tel. 01 539 4242, www.ambihouse.ie[adrotate group="4"]